
The performance of a correctly selected seal also depends on proper preparation of the mounting channel and air connection. Start by checking the selected profile's technical drawing and installation information.
Preparation before installation
- Compare the channel dimensions and opposing surface gap with the drawing.
- Check for burrs and sharp edges that could damage the seal surface.
- Ensure that the channel and contact surface are clean.
- Check that the valve opening suits the connection.
Position the seal and connection
Install the profile without twisting it or forcing it around corners. Use the retainer or adhesive method recommended for the selected profile. Support the air hose and metal connection so that they do not pull or bend the valve.
Initial operating check
Prepare the system in a depressurised state before connecting the air line. With the equipment in a safe operating position, gradually increase pressure to the value specified for the application. Check that contact is established around the perimeter and that the connection does not leak. Release the air before moving the lid or component.
Installation and Application Guide provides retainer and valve options.
Technical reference: Pawling — controlled inflation and deflation. The final installation sequence must follow the instructions for the equipment and profile in use.
